Batch and Queue
A mass-production approach to operations in which large lots of parts are processed and moved to the next process, regardless of actual need, where they wait in a queue. See : Continuous Flow, Lean Production, Overproduction, Push Production.
Cell
A location where the processing steps for a given item take place immediately one after another, so that parts, documents, etc. can move in a flow very close to continuous, whether one unit at a time or in small batches, maintained throughout the complete processing sequence. See: Continuous Flow, Operator Balance Chart, Standardized Work.
Chaku-Chaku
A method of conducting one-piece flow in a cell in which the machines unload parts automatically, so that the operator (or operators) can carry a part directly from one machine to the next without stopping to unload it, thereby saving time and motion. See : Cell, Continuous Flow.
Changeover
The process of switching production from one product to another on a machine (for example, a press or an injection molding machine) or on a series of linked machines (an assembly line or cell) by changing parts, dies, fixtures, molds, etc. (Also known as setup.) Changeover time is measured as the time elapsed between the last part of the run just completed and the first good part after the changeover. See : Single-Minute Exchange of Die - SMED.
Continuous Flow
Producing and moving one item at a time (or a small batch of items) through a series of processing steps as continuously as possible, with each step making just what is requested by the next step. See : One-Piece Flow, Batch and Queue, Flow Production.
Cross-Dock
A facility that selects and (re)combines a variety of items coming from various suppliers so that they can be shipped to the various customers, such as assembly plants, distributors or dealers.
Cycle Time
The time required to produce a part or complete a process, as actually measured.
Demand Amplification
A tendency observed in multi-step processes, in which the production orders received by each upstream process are more erratic than the actual production or sales of the downstream steps. Also known as the Forrester Effect (after Jay Forrester of MIT, who first characterized this phenomenon mathematically in the 1950s) and the Bullwhip Effect. See: Build to Order, Heijunka, Level Selling.
Every Part Every Interval
The frequency with which each part is produced in a production process. See: Heijunka.
First In, First Out (FIFO)
The principle and practice of maintaining precision in the sequence of production and material movement, ensuring that the first part to enter a process or storage location is also the first part to exit. This ensures that stored parts do not become obsolete and that quality problems are not hidden in inventory. FIFO is a necessary condition for implementing a pull system. See: Kanban, Pull Production, Supermarket.
Flow Production
A production system introduced by Henry Ford at the Highland Park plant in Michigan in 1913. The aim of flow production was to drastically reduce product throughput time and human effort through a series of innovations. See : Continuous Flow. Compare with : Mass Production.
Fulfillment Stream
A supply chain that incorporates lean principles and, consequently, operates collaboratively and smoothly in flow, instead of operating as a group of related connections.
Heijunka
Leveling the type and quantity of production over a fixed period of time. This enables production to efficiently meet customer demands while avoiding excess inventory and reducing costs, labor, and production lead time throughout the value stream. See : Demand Amplification, Every Part Every Interval (EPEx), Just-in-Time (JIT), Muda, Mura, Muri, Single-Minute Exchange of Die - SMED.
Heijunka Box
A tool used to level the mix and volume of production by distributing kanban at fixed intervals. Also known as a leveling box. See: Every Part Every Interval (EPEx), Heijunka, Kanban, Material Handling, Paced Withdrawal, Pitch.
Information Flow
The movement of information from customers to the point where it is needed to trigger each operation. See : Value Stream Mapping and Product Family Matrix.
Inventory
Materials (and information) present along a value stream between processing steps. Physical inventory is usually categorized by its position in the value stream and by its purpose. Raw materials, work-in-process and finished goods are terms used to describe the position of inventory in the production process. Buffer stock, safety stock and shipping stock are terms used to describe the purpose of inventory.
Isolated Islands
An inadequate layout of the workflow in which people are unable to help one another and work as isolated islands. The term also refers to disconnected processes in a value stream or cell, which run at their own pace, unlinked to customer demand.
Just-in-Time (JIT) Production
A production system that makes and delivers only what is needed, when it is needed, and in the amount needed. JIT and Jidoka are the two pillars of the Toyota Production System. JIT relies on heijunka and is made up of three operating elements: the pull system, takt time, and continuous flow. See : Continuous Flow, Heijunka, Jidoka, Pull Production, Takt Time, Toyota Production System.
Articles
In pursuit of the "perfect order"
Lean at SMC: a “Brazilian recipe” for transforming a company worldwide
Lean Thinking practice increases productivity in Vale's railway operation
Lean supply chain needs to connect purpose, processes and people
Applying Value Stream Mapping in E-commerce: Mercado Livre
Leveled pull system: adaptability for uncertain times
Lean management connects marketing and sales with the whole company
Transforming automotive services: the tire case
Improving Performance in a Customer Relationship Center
A Technique for Bridging the Gap between Marketing and IT
Operational Excellence goes hand in hand with knowing the customer intimately
Read articleStandard operating procedures that can make you more flexible
Read articleWhat is the best way to understand VALUE (in terms of what our customers want)?
Lean in Sales and Marketing
It seems lean these days is just about learning and training. What about good old-fashioned just-in-time?
Read articleHow Marketing Can Drive Process Improvement
Read articleLean in car dealerships
Read articleHow to tackle the difficulties of the pull system
Read articleSales in the Lean Enterprise
Read articlePull System
Read articleReflecting on buffers and production systems (The Birth of Lean. Chapter IV – The evolution of buffers at Toyota – Kaneyoshi Kusunoki)
Read articleJust in time (JIT)
Read articleTSURUBE FLOW (Pick-up and Supply System); Connecting processes with long lead times
Toyota's goal: create a stress-free store
Lean Leadership in marketing and sales
Eliminating artificial sales peaks
Appendix to Creating a Level Pull System - Additional points for low-volume, high-variety production
Lean Dealerships: Future Competition Will Be Won with Sales and Service
Connecting Assembly to Batch Processes through Basic Pull Systems
On Leveling (Heijunka)
New frontiers for applying the Lean system in services
How to set targets for setup time
Forging set-up learned at Toyota do Brasil
Why so much technology?
Want to learn more about Value stream?
Get in touch with our experts.