It seems lean these days is just about learning and training. What about good old-fashioned just-in-time?
Touché – and I plead guilty. The other day I was at the gemba of a plant that produces industrial equipment and had exactly the same discussion with the plant manager. This colleague has an excellent intuitive understanding of respect and a knack for dealing with people. He is very good at engaging people in the work and has a gift for stimulating both change and maturation. But his corporate management is asking for immediate financial results. Hmm.
Now, in a low-volume, high-variety business managed by MRP, quick productivity results are hard to achieve. There is no cell producing high volumes with ten operators that can be quickly improved (through kaizen) to just five. There are several grinders, lathes, milling machines, a monument of a paint unit, some craftsmen at assembly stations and many operators working wherever the supervisor needed them. Not surprisingly, on-time delivery is a struggle and productivity is low. This isn't seen as a problem since margins per product are high, but we all know how senior executives are when it comes to productivity numbers (and their own bonuses).
To make matters even worse, in a high-variety environment, any increase in volume can mean an increase in shortages of a part or component, which requires a schedule change, leading to less OTD and productivity... so we won't be saved by volume. Too bad. The strategy, then, is to deliver on time as much as possible, in order to get paid by customers and satisfy corporate on cash flow and profits. But how?
Not with safety glasses
We need to look at the same situation through different lenses. One of them, the lens of respect, reveals that anything we ask operators to do that doesn't add value or doesn't contribute to delivering products is a lack of respect. People are here to work, not to fill out paperwork or recount kanban cards. The more focused the work, the more productive we will be and the more likely we will deliver on time. But how can we focus on the right problems?
We can use the other lens: the just-in-time system and the view of the whole factory as if it were a machine. We were looking at the value stream maps his team had made, and they made the common mistake of detailing the material flow and sketching the information flow as a detail. Value stream mapping is part of lead time analysis, not a process analysis. Therefore, two fundamental aspects of VSM are:
- The number of items made on each machine, since production lead time is calculated as the time between the last part A of the previous batch and the first part A of the next batch (with batches B, C, D, etc. in between).
- The frequency with which information is updated in the information flow: Once a week? Once a day? Every hour? When something happens? And so on.
The main problem in a high-variety environment is that although everyone is busy working, they are often working on the wrong part. As we walked the shop floor, we checked the work orders: the early ones (parts needed next week, also known as overproduction) or late ones (parts needed yesterday, also known as waiting). So we tried to look at the production process as a dynamic system of information converted into actions and then into parts. What tells you what to do, who will do it and when to do it. The more frequent – and more regular – the update, the better the chances of doing the right thing at the right time.
Do you want fries with that kanban?
Developing the dynamic view of just-in-time is not done intuitively, and it requires learning the techniques and discipline of a pull system. For example, they would schedule a vague form of kanban with a launcher that had many, many cards. Now, any restaurant runs on kanban. The waiter out front takes orders when people sit down and then places them in front of the kitchen to be made in the same order. The cook takes each order and either (1) it's the dish of the day, so he takes the plate from the supermarket of ready dishes, or (2) it's à la carte, and he has to make the dish from scratch. Then he delivers it. Like a complex product, a table has to receive different dishes at the same time, but restaurants usually get it right – so why don't factories?
Back at the gemba, we looked at the launcher and calculated that the production team had orders for the next three days. That is an enormous overproduction of information and causes several problems. First, what is the likelihood that the kanban cards truly represent what will actually be needed three days from now? Second, with cards for three days of production in front of you, how tempted would you be to pick the ones you think are most urgent or easiest to do? Third, and this is where just-in-time fits with involvement and engagement, with three days of work in front of you, how determined would you feel to finish the work, rather than smoke another cigarette before changing the machine setup once again? How involved would you feel with the company's determination to deliver to customers what they ordered?
There is a tricky catch to being able to pull: it completely changes the job of frontline management. The supervisor can no longer decide what to do, since the cards must be followed, like following a recipe. The supervisor must now focus on doing the work right, which is even more like following a recipe. Some supervisors will love it, feeling freed from self-defeating decisions; some will hate it for feeling technically challenged and for losing their petty boss power.
Furthermore, it also means that information management and material handling have been taken out of the operator's job and given to a specific logistics function: the route that delivers parts and picks up cards, cards that will then need to be sorted and redistributed. When this happens, we suddenly understand how much many operators have to perform that has nothing to do with manufacturing parts.
The difficulty, of course, is walking on both feet - to hold both different views - just-in-time and respect for humanity - and, at the same time and without haste, learning to understand how they converge. This was, I believe, already the point of the first article on lean published by Toyota veterans in 1977, although at the time the article was focused on calculating kanban cards. We learned the hard way that respect is as important as kanban, but perhaps now we are more than right. Without understanding both the JIT system and the card, respect becomes wishful thinking and will satisfy none of our stakeholders: neither the operators (we will “respect” them on the wrong topics – they aren't fooled so easily; involvement comes from sharing the company's goals) nor corporate. It isn't easy, but let's tackle this problem!
Portuguese translation by Tamiris Masetto Manzano.