Appendix to Creating a Level Pull System - Additional points for low-volume, high-variety production

This article seeks to offer some additional points on creating a pull system in low-volume, high-variety production.

Portuguese translation by Odier Araujo.

Introduction

In 2004 I wrote a workbook for the Lean Enterprise Institute (LEI)* titled "Creating Level Pull". It describes a twelve-step process to help companies move from a push production system to a system with more level, pull-based operations, as found in lean companies. The workbook uses a mid-sized auto parts plant, with standardized products and fairly repetitive volume. For most production cases this example is sufficient and provides a reasonable amount of information. However, for many industries this case does not match the problems they face day to day. Unfortunately, no book can cover every example or answer every question. They usually present a collection of data and observations to offer specific advice, but at LEI’s request I wrote this short “online” appendix to the workbook, to offer some additional points on creating a pull system in low-volume, high-variety production.

1. Stability of the assembly schedule is critical

Most of the low-volume, high-variety operations I have observed have a final assembly department fed by component-producing processes and by purchased parts. The typical problem is the inability to get the right part to the right place at the right time in assembly, consistently. This symptom then shows up as late deliveries to the end customer, inefficiency in the plant and a considerable increase in WIP internally.

Most of the time, the problem typically lies in upstream component production or with suppliers and their inability to sequence products in time for final assembly. However, final assembly is usually a contributing factor to this problem, since the final assembly schedule is changed with little time to allow a reaction.

For any scheduling, inventory control and material handling system to work, some level of basic stability in the assembly schedule is required. Even at Toyota Motor Corporation the final assembly schedule is frozen for a period of 2 to 3 days. Otherwise, many ripples are caused upstream that disrupt production and worsen productivity and on-time delivery. This destructive phenomenon is popularly known as the “bullwhip effect”, since it sends waves of demand amplification upstream. For an internal logistics system to work optimally, this effect needs to be analyzed and minimized.

2. Traditional scheduling practices usually make things worse

Traditional scheduling practices usually make things worse due to the problems inherent in the MRP system. MRP programs often assume infinite capacity and only work well when the data and assumptions fed into the program as input are adequate. The systems are not necessarily updated in real time throughout the day with accurate information about progress and changes in demand.

Compounding this problem is the internal logic of the inventory and lot-sizing system, which is based on a modified form of Economic Order Quantity (EOQ) theory. In addition, some types of schedule optimization algorithms that typically exist seek to maximize labor productivity at the cost of compromising “on time” delivery. Add to this the traditional operational metrics that reward efficiency (actual hours compared with standard hours) and productivity (efficiency times utilization), and you have a system designed to overproduce and that contributes to producing the wrong parts at the wrong time. Inevitably, the "hot lists" and "super-hot lists" appear, and eventually the "shout-based" pull system – "do this now or you’re fired!".

Shop floor supervisors and material coordinators react by overriding the published schedule and working by their own rules in order to survive. Once the processes supplying components to final assembly begin to behave this way, it is virtually impossible to get the right parts at the right time to assembly, except through management force, excessive communication and internal scrambling.

A good exercise is to stop for a moment and calculate the EPE (Every Product Every) interval of the upstream processes. Typically, these machines are scheduled according to some kind of logic based on economic lot size and are producing large lots. Add up the available time the machine can run in a given period and subtract the actual average demand. For example, this might be 40 hours in a week minus 30 hours of production. The remaining 10 hours must be used intelligently if you want to work efficiently. If the average setup time is one hour then, per week, a maximum of 10 setups can be performed. If by magic there are 10 “part numbers” that run on the machine, then all ten can be produced in one week. In other words, the interval is every part every week. When I do this kind of calculation with companies, we usually find machines producing lots much larger than what should be produced. Reducing lot sizes has beneficial effects, such as lower inventory, shorter “lead time” and a greater probability of having the right component in stock.

3. Supermarkets still work

One point that is often lost in discussions about low-volume, high-variety situations is that supermarket logic, in principle, still works. There are usually 80/20 rules hidden in most production situations, in finished goods, in intermediate WIP, in purchased parts or in raw material. Even if the final product is a made-to-order item, the components and subassemblies needed for that product may not be all that unique. The key to making a system work in these cases is to ensure that components are found and placed as needed. Spend a little time drawing a Pareto Chart for the material used in production, at the various stages of manufacturing. If there are key locations where standard components are used, then make sure they are stocked appropriately and sent to the line exactly when they are needed.

4. The discipline of problem solving

In the end, however, when I work with companies trying to solve difficult issues, I first encourage them to clearly define what the problem is before going too far with implementing "solutions". The answer is not always to fix internal scheduling or implement kanban, for example. If the problem is on-time delivery, then find out the reasons why products cannot be shipped on time, practice good "5 Whys" and look for the root cause. Usually 80-90% of the problem is a matter of supplier delivery or a problem with internal quality, staffing or availability. These real "problems" must be solved, otherwise changing the production schedule will be just a palliative that does not address the root cause. If you practice good problem-solving discipline, then in most cases you will be able to solve the problem on your own. This is all Taiichi Ohno ever did at Toyota’s facilities in the 1950s, when he solved the internal problems of not having the right parts in stock at the right time. Setup reduction, kanban and leveling are all techniques that were merely created along the way in the practical pursuit of solving problems on the shop floor.

Art Smalley helps companies implement lean through Art of Lean, Inc. and as an author and faculty member of the Lean Enterprise Institute (LEI), where he teaches the workshops Fundamentals of Lean Production: Creating Stability in the 4Ms and Creating Level Pull. He is the author of the workbook “Creating Level Pull”, which describes how to create a lean production control system for a plant with multiple product families. Art was the first foreigner to work at Toyota in Japan and spent most of his Toyota career helping to transfer production, engineering and management systems to facilities around the world. He subsequently joined Donnelly Corp. (now part of Magna Inc.) and later McKinsey & Company.

Read also: continue your learning journey

How to tackle the difficulties of the pull system

Industry and Manufacturing

How to tackle the difficulties of the pull system

Read article
Reflecting on buffers and production systems (The Birth of Lean. Chapter IV – The evolution of buffers at Toyota – Kaneyoshi Kusunoki)

General

Reflecting on buffers and production systems (The Birth of Lean. Chapter IV – The evolution of buffers at Toyota – Kaneyoshi Kusunoki)

Read article

From theory to practice: next steps

Team in a consulting meeting

Lean operations consulting

Diagnosis, planning and implementation with experts working directly in your organization's gemba.

Learn more →
Professional organizing sticky notes on a board

Lean training

In-person and online training for leaders who want to implement continuous improvement in their organizations.

See upcoming dates →
Launch of the book Gente Lean — Management is not about tools, it's about people

Turn knowledge into results.

At LeanShop you'll find the leading books, e-books and collections on Lean, Lean Thinking, continuous improvement, leadership and operational excellence to take your management to the next level. Explore content that helps professionals and companies create more value with less waste.

Visit LeanShop now →