What is Supermarket?

The location where a predetermined standard inventory is kept to supply downstream processes.

Meaning and application in management

In lean vocabulary, a supermarket is the location where a predetermined standard inventory is kept to supply downstream processes. Supermarkets are usually located near the supplying process to help it see its customers' usage and requirements.

Diagram: on the left, lines A, B and C feed a single consolidated supermarket; on the right, there is a supermarket next to each line and the material handler withdraws from each one with kanban
Consolidated supermarket × a supermarket for each line: locate it as close as possible to the supplying process (Kaizen Express)

Common implementation mistake

Setting up a consolidated supermarket far from the lines to save the material handler's work. The purpose of supermarkets is to connect physically separated processes as a flow and to identify and solve problems more quickly; reducing the material handler's work is not the main objective. A supermarket next to each line makes it clear, for example, which line is producing defects.

Each item in a supermarket has a specific location from which a material handler withdraws products in the precise amounts needed by a downstream process. When an item is removed, a signal to make more – such as a kanban card or an empty bin – is sent to the supplying process. That is why a supermarket is not only a storage place: it creates pull by requesting replenishment, that is, by filling the gaps created when the customer withdraws product.

Supermarket between supplier process A and customer process B, with production kanban, withdrawal kanban, new product and withdrawn product
Supermarket diagram: the withdrawal kanban authorizes the customer process (B) to withdraw product, and the production kanban authorizes the supplier process (A) to replace what was taken (Léxico Lean)

A supermarket is used where continuous flow is not possible between two processes. It holds items in a quantity that varies between a minimum and a maximum, determined by the size of the interruption it is meant to absorb, and it must always be linked to a pull system: when the quantity reaches a low level, a replenishment order is generated for the material's supplier.

How to apply it in your organization

  • First define how finished goods will be scheduled (supermarket or build to order) and start kaizen at the process closest to the customer, then expand it to upstream processes.
  • Give each item a fixed location and set the maximum quantity for each one.
  • Place the supermarket as close as possible to the supplying process – preferably one supermarket next to each line rather than a single consolidated supermarket far from them.
  • Link the supermarket to a replenishment signal (kanban or empty bin) so that each withdrawal triggers production of what was consumed.

The origin of the concept

Toyota installed its first supermarket in 1953 in the machine shop of its main plant in Toyota City. Taiichi Ohno, a company executive, took the idea from pictures of American supermarkets, where products were placed on shelves at specific locations for customers to take. Ohno visited the U.S. in 1956 and later remarked that the supermarkets he saw on that trip impressed him more than the big American factories.

Supermarket pull system

The supermarket system is the most basic and most common type of pull system, sometimes called “A-type pull.” It differs from building directly to shipping (“B-type pull”), used when order frequency is low and the customer lead time is longer than the lead time from the pacemaker process to delivery. B-type pull keeps inventory at lower levels, but it requires a reliable stream and a short lead time.

A-type pull system diagram: the customer sends the order to the scheduling department, which feeds the heijunka box at shipping; shipping and process 2 withdraw from the supermarkets of the preceding processes, and each withdrawal generates a replenishment kanban
A-type pull system: the customer order is leveled in the heijunka box at shipping, and each withdrawal from the supermarkets pulls replenishment from the preceding processes.

Key takeaways on the topic

  • A supermarket is a standard inventory, with a fixed location per item and defined minimum and maximum quantities.
  • Each withdrawal sends a replenishment signal to the supplying process: it is the basis of A-type pull.
  • It should be close to the supplying process, to connect separated processes and make problems visible.
  • The idea came from American supermarkets; Toyota installed the first one in 1953.

Keep learning with the lean vocabulary

Explore related terms and go deeper with real-world analyses by our industry leads.

Related term

Demand Amplification

A tendency observed in multi-step processes, in which the production orders received by each upstream process are more…

View term
Success story

Lean Logistics

See how this concept and management mindset were applied in practice to deliver real business results.

Read the full article
Hands-on training

Practical Lean Training Program - Manufacturing

Build leadership and problem-solving skills at the gemba with support from our specialists.

See the training