Changeover
The process of switching production from one product to another on a machine (for example, a press or an injection molding machine) or on a series of linked machines (an assembly line or cell) by changing parts, dies…
See concept10 results found
The process of switching production from one product to another on a machine (for example, a press or an injection molding machine) or on a series of linked machines (an assembly line or cell) by changing parts, dies…
See concept
Producing and moving one item at a time (or a small batch of items) through a series of processing steps as continuously as possible, with each step making just what is requested by the next step. See : One-Piece Flow…
See concept
A production system introduced by Henry Ford at the Highland Park plant in Michigan in 1913. The aim of flow production was to drastically reduce product throughput time and human effort through a series of innovations.…
See concept
A work practice in which operators run more than one machine in a layout of process islands. It requires separating human work from machine work and is normally made easier by applying jidoka and auto-eject devices on…
See concept
A series of individual operations that must occur in a specific sequence to create a design, fulfill an order or make a product.
See concept
A series of techniques pioneered by Denso (Toyota Group) in Japan to ensure that every machine in the production process was always able to perform its tasks. See : Overall Equipment Effectiveness (OEE).
See concept
Inherent content of a product or service, as judged by the customer, reflected in its selling price and market demand. The value in a typical product is created by the producer through a combination of actions, some of…
See concept
All the actions, both value-creating and non-value-creating, required to bring a product or service from concept to launch (also known as the development value stream) or from order to delivery (also known as the…
See concept
An approach to designing products and services in which developers consider sets of ideas rather than a single idea. See : Trade-off curves.
See concept
Broaden your perspective with other concepts and content related to your search.
Production time lost due to stoppages, whether planned or unplanned. Planned downtime includes scheduled stoppages for activities such as start-of-shift production meetings, changeovers and maintenance. Unplanned…
ExploreAny design, schedule or production technology with large-scale requirements and long changeover times, requiring that designs, orders or products be brought to it and wait in a queue for processing. See: Capital…
ExploreHighly capable process equipment that is easy to maintain (and therefore available to produce whenever needed), allows quick changeovers, is easy to move and is designed to be installed in small increments of capacity…
ExploreLook up the key terms, concepts and definitions to master the language of the lean system.
Go to the glossary →Discover Léxico Lean, the reference book for understanding the main concepts and terms of the lean system (in Portuguese).
See it at LeanShop →Try related terms to find other perspectives on this subject.
Explore different ways to continue your learning journey.
Some problems take more than finding a definition. Lean Institute Brasil partners with organizations to understand real challenges, develop management systems and build internal capability to sustain results.