Leveraging Lean to Clean Up the Oil
Lean has enabled American workers to be more productive, increased U.S. competitiveness in world markets and helped keep jobs in the United States. Now – get ready for this – lean is helping to reduce your dependence on foreign oil.
Aera Energy LLC, an oil company in Bakersfield, California, is using lean principles to improve several key processes, including drilling new wells and repairing existing ones. In fact, the company relies on its broad lean effort to help maximize the number of barrels of crude oil it pumps every day at its Belridge field, a few kilometers from Bakersfield.
Aera pumps about 150,000 barrels of oil daily – roughly a quarter of the daily production of the North Slope of Alaska. All the crude oil produced is shipped by pipeline to refineries in the San Francisco Bay Area or Los Angeles. Although it is not exactly the size of a Chevron, Aera's revenue was more than $5.6 billion in 2011.
Created in 1997 as a joint venture of oil giants Exxon and Shell, Aera's largest asset is the Belridge field, which has been operating since 1911. The company today manages a 66-square-mile oil field with 300 employees and 2,500 contract workers. The contractor handles most of the drilling and maintenance of the wells, while Aera's employees manage this site as well as Aera's other operations in Southeast California.
“Because we are a commodity business, the only thing we control is our cost structure,” said Andy Anderson, vice president of operations at Belridge. Belridge Operations Manager Corey Wolf adds: “We have the view that we need to improve permanently.”
The company employs lean techniques to improve numerous processes, the most important being the drilling of new wells and the meticulous management of operating wells to ensure maximum availability and production. Belridge has 7,000 producing wells, with more than 1,000 new wells being drilled each year and another 1,200 being shut in annually. With so much drilling and well maintenance work going on continuously, it is no wonder that Aera's management is eager to reap the benefits generated by a commitment to continuous process improvement.
Process-Based Organization
“Many companies organize themselves by function or geography,” said Anderson. “We decided to organize ourselves by process, which allows us to develop deep competence around those processes.”
In the eyes of President Guardie Banister Jr., this process orientation has proven essential to Aera's success. “Our people have learned how to map the steps of a process and improve them,” he said. “We have developed a culture of people who are committed to continuous improvement, and our people get excited about being a little better every day.”
Although Aera is not a manufacturing company, Bannister points out that the company has a “manufacturing mindset.” Aera's employees perform thousands of repetitive tasks every day. “There was a time when people in the oil industry believed these tasks were not repetitive, but we have proven that they are. There is no doubt that this is an innovative application of lean in our business.”
Over the years, as Aera worked to improve various processes, the company's lean leaders met resistance from skeptical employees and contractors. “There is a lot of pushback,” said Wolf. “You hear things like: ‘We don't make car parts.’”
But through value stream mapping and breakthrough after breakthrough in the way work is done, both employees and contractors came to embrace lean methods. “What was easiest to translate from the manufacturing world to our operations are things like one-piece flow, process improvements through kaizen and simply getting rid of waste,” added Wolf.
Some lean ideas and practices, however, were not so easy to adapt to the energy environment. “We had to work hard to make some lean concepts work,” said Greg Williams, director of the Continuous Improvement Program.
Maintenance and Repair of Parts
Maintenance and repair of oil wells is one of the most important processes at Aera. The more wells operating each day, the more money the company makes. With more than 200 wells repaired each month, the company has focused a good deal of time and attention on refining the maintenance process and achieving good performance in the repetitive steps that make up the well repair processes.
Because something as simple as an electrical failure or an outage in the field can shut down one or more wells, managers take stock every morning of exactly what work needs to be done and, at the end of each day, of what work was completed. Thus, suppliers (contractors) receive a daily pace sheet of the work they must perform. Aera's staff monitors their efforts during the day to ensure that the work is progressing according to schedule.
The most frequently performed tasks have a specified takt time. When a well fails, managers are notified by a signal from an electronic controller at each well site that communicates its condition. "Every time a well has a problem, we do a root cause analysis of the failure, and that information goes into our well database," explains Anderson.
For example, well repair technicians know exactly which tools, equipment and materials are needed to fix most of their failures. Each well repair rig is prepared and equipped in advance so that the repair crews do not have to go looking for materials or tools to load onto their trucks – instead, they are ready to go as soon as they are notified which well to work on. This move to one-piece flow for well repair has enabled Aera's repair crews to complete the average downhole well repair in hours versus what used to be an average of days.
Preventive maintenance is also a hot topic at Aera. Early in its history, the company suffered from a series of inefficiencies in operations. For example, there was a huge backlog of underperforming equipment, especially oil well pumps that had broken down. This translates directly into less oil being pumped out of the ground each day.
The company's engineers – problem solvers by nature – discovered that pump vibrations increased as the pump wore out and came close to failing. By connecting a vibration measuring device to each well pump, managers in the Aera’s Crude Lifting and Measurement (CLAM) group, the group responsible for pumping the oil out of the ground, are now able to detect when a pump is vibrating out of specification and is likely to fail, so preventive maintenance can be done. "Our well service crews used to be rewarded for repairing a pump at two o'clock in the morning," says Stanley Gomes, process manager. “Now they are rewarded for doing PM on a pump.”
Drilling New Wells
In the past, Aera drilled new wells in batches, with about 30 or 40 wells to be drilled together. But the company discovered that, by switching to one-piece flow in well drilling, it can drill more wells per day. Standard operating procedures and balanced work have gone a long way toward reducing the time it takes to drill each well.
Aera has become so adept at drilling new wells that people from the oil industry around the world come to Belridge to observe the company's process. “We are manufacturing wells," says Ted Witt, operations manager of the well development group, which spends $300 million a year drilling new wells.
The process includes the initial project phase, in which Witt and his team select the site and secure the budget for the drilling activity. Next comes pre-drilling, in which the location is carefully surveyed, especially taking into account other nearby producing wells. Then comes surface construction and well completion and, finally, the installation of downhole equipment, such as an electric submersible pump to operate the well. All of this is followed by the final construction of any controllers or other electrical devices needed to operate and control the well. The last step is the handover of responsibility to the CLAM group, which will operate the new well.
Witt points out that, although Aera has moved away from large batches – the drilling volume was 30 or more wells at a time, which was cumbersome and inefficient – even today the company may drill up to 10 or so wells at once in the same area. “In 2012, we expect to drill and bring on line 1,200 new wells,” he says. “Just as oil prices have gone up, inflation is also dramatic, and the challenge is how to make it all work without it costing three times as much.”
One way to achieve this has been to ensure that all suppliers – in this case, the oil drilling contractors – have fully bought into the idea of continuous improvement. “To work for Aera, you have to have a very strong continuous improvement mindset,” says Witt.
Another is through the adoption of a number of lean principles. For example, the well development group has moved from a large-batch process to small batches. The group has implemented:
- Waste elimination;
- Small batches;
- Standardized processes;
- Workload leveling;
- Visual systems;
- Process mapping.
Aera's successive kaizen over the last decade have allowed the company to keep drilling costs constant throughout that time, despite inflation. “We have been able to hold our $100 cost per foot in new well development for 10 years, absorbing the ongoing cost of inflation over that time,” says Stanley Gomes, process manager at the Aera Academy, the company's training organization. “All these small kaizen add up to a lot.”
As you can imagine, drilling oil wells – even when you know there is oil underground – is not cheap. “We can spend several million dollars to drill 10 wells,” says Witt. “In 2012, we expect to drill and bring on line 1,200 wells.”
But although oil prices have gone up, inflation has also kept pace. “The challenge for us,” Witt says, “has been how to handle all this work and keep it from costing three times as much.” Holding the drilling cost per foot (1 foot = approximately 0.3 meters) at $100 over the last decade has been accomplished by “going from a functional organization to a lean organization.”
In 2011 alone, Witt reports, kaizen in the development group yielded $5 million in savings, including $3.7 million in savings from process improvement and $1.1 million from material reuse.
A good example of an area where the development group's kaizen efforts had a major impact on the business was in reducing production lost due to well displacements. By meticulously tracking the exact location of each well and its components and controls, Aera's Development team was able to drastically reduce the downtime resulting from well displacements – that is, the need to adjust other nearby producing wells to allow the new well to be drilled.
The company reduced the number of displacements per new well drilled from five to approximately one or two. This was achieved through a better understanding of the layouts of each existing well, typically on a plot measuring 100 by 200 meters. The company once lost 500 barrels of oil per day due to displacements of producing wells; today that is no more than 120 barrels per day.
Displacing a producing well may cost the company only two barrels of oil per day for a low producer but, conversely, for a higher producer, it could mean the loss of 18,000 barrels per day.
Problem-Solving Culture
To build a problem-solving culture, Aera set out to create an army of problem-solving employees and contractors. Says Wolf: “We ask people: ‘Do you have an improvement idea?’. We allow any idea, no matter how simple it is.”
Another way to promote a problem-solving mindset among employees was to adopt leader standard work. “To succeed with lean, you need to have engaged leaders,” says Anderson. Lean leaders trained other leaders in problem solving, and each leader was required to do a certain number of task validations per year.
CLAM, Aera's oil pumping group, has been a major user of lean ideas to increase its output. For example, team leader Jeff Joseph holds a daily kaizen every morning with team members, who report on problems occurring in the field and share ideas on how to fix them. The teams are organized by process, such as Crude Lifting and Measurement; Development; Injection; and Treatment. “That way, you know who your customers and suppliers in your process are,” explains Wolf.
Managers are required to spend their time performing leader standard work, training their employees in problem-solving techniques and encouraging employees to contribute their ideas for continuous improvement. During the first six months of 2012, Aera's managers at Belridge had held 1,062 problem-solving discussions with employees. “If we don't do this, we find leaders spending too much time in their office and not enough with employees.”
As part of its efforts to reduce waste in operations, Aera operates its own recycling center. When they wear out, well pumping units for oil production and injection wells are remanufactured on site. The latter type is used to pump water back into the ground after the oil has been removed. All the reconditioned “skids,” as they are called, contain pumps, meters and control valves and are ready to be moved to a new well.
Building and Sustaining Lean
Aera's management recognizes the importance – and the challenge – of sustaining lean efforts over the long term. Many companies have seen their efforts fail after making great strides early on. One way Aera helps ensure sustainability is through quarterly meetings the CEO leads with the various heads of different key processes. A key topic discussed at these meetings is the assessment of how the company is doing with regard to:
- The number of kaizen completed;
- The dollar value of savings achieved with lean;
- The number of six sigma projects completed;
- The number of lean leaders maintaining employees' work.
Another requirement designed to ensure the sustainability of lean is that all of the CEO's direct reports must carry out at least two kaizen per year.
Aera faces a problem common to many companies today across all sectors - more than half of Aera's employees are over 50 years old and most of the rest of the staff have been with the company for less than two years. “I think many companies are facing the same dilemma,” says Gomes. “We are concerned about all the knowledge that will leave Aera in the coming years, as older employees retire.
“We want to keep our culture and also ensure the transfer of knowledge to new people,” explains Gomes. “The Academy will teach people the Aera way.”
Portuguese translation by Tamiris Masetto Manzano.