Lean consulting by sector

Reliable assets and predictable turnarounds, with safety first

Lean Institute Brasil helps operators, refineries, terminals and service providers stabilize operations and maintenance, involving in-house and contractor teams in solving problems.

Technicians in safety gear inspecting a refinery

Challenges

The challenges we see most in the sector

  • Turnarounds that overrun schedule and cost

    Scope grows during execution, work fronts wait for materials, permits or equipment, and the return to operation is delayed.

  • Failures in critical assets

    Maintenance lives on urgent corrective work. The same failures come back because the cause is not investigated to the end.

  • Safety that depends on vigilance

    Procedures exist, but the actual work drifts away from them. Deviations only show up after an incident or an audit.

  • Many contractors, little integration

    Operations, maintenance, procurement and contractors plan separately. The interfaces turn into waiting and rework in the field.

Where we work

Where lean makes a difference

  • Maintenance turnarounds

    We structure turnaround planning, preparation and execution with visual management, leveled work fronts and daily meetings that remove blockers within the same shift.

  • Maintenance and reliability

    We review the work planning and scheduling flow and shift effort from corrective to preventive and predictive maintenance.

  • Operating routine and process safety

    We make critical conditions and standards visible in the field and create leadership routines to address deviations before they become incidents.

  • Procurement and support logistics

    We link the warehouse, purchasing and logistics to the maintenance schedule so that materials and tools are on site when the job starts.

Results

What changes in practice

  • Higher asset availability

    Fewer unplanned shutdowns, because the causes of failures are now addressed, not just the effects.

  • More predictable turnarounds

    Schedule and cost stay closer to plan, with less waiting and improvisation on the work fronts.

  • Stronger safety day to day

    Deviations show up early and are addressed by leaders in the field, together with those who do the work.

Method

How we work

  1. Grasp the current situation

    We go where the work happens, with leaders and teams, to see the real problems and decide together what needs to improve first.

  2. Experiment in a pilot area

    We apply lean to a selected flow or area, with clear targets, to learn fast and show results.

  3. Scale up with your own people

    We develop internal leaders and champions to take what worked to the other areas.

  4. Sustain it day to day

    Management routines, visible indicators and problem solving sustain the gains and continuous improvement.

Also explore our consulting practice areas, such as daily management, hoshin kanri and kaizen.

Questions

Frequently asked questions

It does. In continuous processes, the gain does not come from rearranging an assembly line, but from stabilizing operations, increasing asset reliability and bringing flow to the work around the plant: maintenance, turnarounds, procurement, engineering and work permits. These are the activities where waiting and rework concentrate.

It should not. In lean, safety comes before any other goal, and stable, standardized work is a condition for it. No safety barrier is treated as waste. What gets eliminated is waiting, improvisation and rework, which tend to be precisely the situations in which people are exposed to risk.

It depends on what weighs most today. A planned turnaround is a good starting point, because it has a defined scope, schedule and team. Another option is a unit or system with a history of repeated failures. In both cases, you start small, with the local team, and the learning guides the next steps.

Shall we talk about your operation?

Tell us about your context and the results you are looking for. A Lean Institute Brasil expert will get back to you to understand the scenario and suggest next steps.

Talk to an expert