What is Tsurube System?

A method for maintaining flow between disconnected processes, separated by steps outside the line or plant that are too costly or too large to move.

Meaning and application in management

The tsurube system is a method for maintaining flow between disconnected processes – processes separated by steps outside the line or plant that are too costly or too large to be moved. Using the technique of pulling through FIFO (first in, first out) lanes, tsurube keeps a standard number of parts leaving and returning to the system in sequenced order.

The name comes from the Japanese tsurube houshiki, the system of two buckets tied to the same rope used to draw water from a well: an empty bucket goes down toward the water while the other, full, comes up to the surface. In the same way, each time items are withdrawn for the isolated process, the same quantity of already processed items returns to the main flow.

How to apply it in your organization

  • First ensure that the manufacturing processes are stable: this is a precondition for using tsurube to keep production in continuous flow and pull.
  • Use FIFO lanes at the inbound and outbound sides of the isolated process to preserve the sequence of items.
  • Set a fixed interval and a standard quantity for withdrawals and deliveries, so that any disruption becomes visible.
  • Ask why the process is isolated and how it could be better integrated into the flow.

How it works

In the Lean Lexicon example, a tsurube system maintains flow between the main process and heat treatment. Every 20 minutes, a set number of items arrives at the heat-treatment inbound FIFO lane from the outbound FIFO lane of operation 20. Also every 20 minutes, the same number of heat-treated items is carried from the heat-treatment outbound FIFO lane to the inbound FIFO lane of operation 40. The FIFO lanes maintain the sequence of the items to be processed.

Diagram of operations 10, 20 and 40 and heat treatment linked by FIFO lanes, with 20-minute cycles
Tsurube system example: FIFO lanes link operations 20 and 40 to heat treatment, with withdrawals and deliveries every 20 minutes (Léxico Lean)

Because withdrawals and deliveries happen at regular intervals, managers know at every interval whether there has been any disruption in the flow.

Key takeaways on the topic

  • The tsurube system maintains flow between processes disconnected by steps that cannot be moved.
  • It works like the two buckets of a well: a standard quantity goes out, the same quantity comes back, in FIFO sequence.
  • The regular pace of withdrawals and deliveries makes disruptions visible, but the isolated process remains an improvement opportunity.

Keep learning with the lean vocabulary

Explore related terms and go deeper with real-world analyses by our industry leads.

Related term

Batch and Queue

A mass-production approach to operations in which large lots of parts are processed and moved to the next process…

View term
Success story

Continuous Flow

See how this concept and management mindset were applied in practice to deliver real business results.

Read the full article
Hands-on training

Practical Lean Training Program - Manufacturing

Build leadership and problem-solving skills at the gemba with support from our specialists.

See the training