Many companies have used the “kaizen blitz” method, or 5-day kaizen workshop, to implement lean. After evaluating the results achieved and sustained over time, we have noticed that, despite the immediate benefits it brings, there are serious limitations to this strategy.
A kaizen blitz is a group activity, usually lasting 5 days. It is run by external or internal consultants who lead a group of people, often from various areas of the company, who identify and improve a given process.
Typically, the week consists of an initial phase of observation and data collection, followed by defining alternatives and drawing up a plan, through to implementation and presentation of the results to the company's leadership. Pending actions require subsequent follow-up (see Lean Lexicon, 2nd edition, p. 98).
The goals of the workshops may be to create continuous flow cells to reduce lead time, space and inventory and increase productivity; to implement pull systems via supermarkets between processes to ensure supply and reduce inventory; to reduce changeover times to increase availability and allow smaller production batches, among other frequent topics.
Years ago, when lack of knowledge prevailed and there was greater skepticism about the lean system, these workshops showed in practice, quickly and without requiring significant investment, the benefits of this system thanks to almost always impressive results that were visible to everyone. They worked as an awakening, serving to convince company leadership to actually begin their lean journey.
However, as an implementation strategy, the kaizen blitz has severe limitations. We have repeatedly seen that in companies implementing lean via kaizen blitz, after many years of work and hundreds of kaizens run by external agents, there is no systemic connection between the improved areas and, worse, there is no effective continuity after the experienced consultant leaves. Thus, over time, kaizen workshops tend not to produce improvements, becoming simply collective efforts to solve problems of instability or even problems caused by the absence of standardization.
A systematic approach to problem solving through the structuring of an effective help chain should be the most appropriate method for tackling stability problems. And standardization should be present in every activity. The 1-week kaizen workshop should not be a substitute for this. Stability and standardization must always precede kaizen.
In addition, despite the progress in spreading lean knowledge in recent years, consultants with a systemic view and the necessary experience are rare.
A frequent mistake is to carry out kaizen in areas with serious stability problems and a lack of standardization. For example, a “kaizen workhsop” may tackle an area with visible excess inventory (stacked materials piling up in the aisles, etc.). In one week the area is cleaned and organized (2S), a supermarket is implemented, visual management tools are implemented, etc., and one week later the area looks wonderful. The results are presented and everyone celebrates! But if the stability problems were not addressed, nor any serious standardization effort made, some time later things go back to the previous “normal” state.
Therefore, stability problems and the lack of standardization should be seriously addressed before launching vigorously into kaizen blitz. Or else, a significant effort should be made at the end of them. If this does not happen, kaizens serve to create temporary islands of excellence and momentary satisfaction, soon followed by a loss of credibility and finally the belief that the Lean system does not work. And since these are point improvements, they often fail to bring about sustained systemic improvements.
That is why we clearly distinguish systemic kaizen, through the use of the Value Stream Mapping tool and linked to the requirements and needs of the business, from point kaizens, which are frequently the object of the blitz.
Implementation via kaizen blitz brings an additional distortion, which is turning the number of kaizens carried out into an indicator of success in the lean transformation. A simple calculation can show that the sum of the gains obtained from the individual kaizens added together is far lower than the systemic gain actually achieved.
After many years of blitzes, companies rarely return to their original state, but the gains initially achieved are not sustained. And most serious of all, the kaizen mindset does not take hold, kaizens become bureaucratic, lose credibility, and the company stops making improvements.
There is a growing number of companies convinced that lean is the right path. The task, then, is to implement it correctly, starting with stabilization efforts, designing a systemic future state and defining the necessary kaizens.
Kaizen is an attitude of constantly improving, essentially meaning continuously turning the PDCA cycle. It should be part of the company's philosophy of always challenging its processes and improving all the time, with its eyes on the customer. It should be in the mindset of the company's employees at all levels and functions. For this to be effective, the prior work of stabilization and standardization needs to be solid. Kaizen always, every day, by everyone. Even if they are small improvements.
An appropriate implementation strategy can transform one-week kaizen workshops into learning and training for middle and senior management, which, incidentally, was the origin and purpose of the kaizen workshop at Toyota. Point kaizens should be linked to a broader action plan, stemming from a vision of the future state outlined based on an assessment of the current situation, always with the macro business objectives established (hoshin).
José Roberto Ferro
President
Lean Institute Brasil