How useful are Six Sigma and the Black Belts and Green Belts that come with it?
I have nothing against six sigma per se. We used it at Danaher, at Wiremold and at many other companies I have been involved with in the private equity business. And although there are, no doubt, many ways to think about six sigma, I have always thought of it as a form of statistical process control (SPC), which is invaluable for finding and smoothing out variation in processes. I find SPC particularly useful when dealing with very tight tolerances or processes with multiple inputs, such as temperature, flow or time, where you could not see what is going on.
SPC was useful to me when I was a group executive at Danaher Corporation. We used it at Jake Brake (one of the companies in my group, which made engine brakes for diesel trucks) when it had trouble holding tolerance on parts coming off its machines. That lack of control generated a lot of rejects when we tried to assemble the final brake, which in turn was causing a lot of defects. So we decided to use SPC to try to eliminate the problem.
Shortly after we started our experiment with SPC, we began working with the Shingijutsu consultants from Japan. Specifically, my colleagues and I worked with three former executives who had spent their careers at Toyota, the last ten years working directly for Taiichi Ohno, the father of the Toyota Production System. They looked at what we were doing with SPC, sort of laughed and simply said “no” – as in “this is no good.” When we asked why it was no good, they would not tell us, indicating that we would not understand, so they would not even try to explain.
Instead, they showed us how to approach the tolerance problem from a lean point of view, which involved rethinking virtually every assumption we had made about how to do the work and improving the complete system, rather than chasing “point optimization” or random improvements. We learned to control the setup and have fixed stops to hold the tolerances, and 100% inspection before a part could move forward, to eliminate the problems. This approach also eliminated all the work we were doing collecting and analyzing all the data, which was nothing more than extra expense and therefore waste. We had, in fact, eliminated the problem at the source.
Solving that tolerance problem was a great learning experience. As I became more immersed in lean over the course of my career, it became clear that the occasional use of SPC could be helpful. However, what scared me was seeing companies use six sigma as their main cost-reduction approach – and, in fact, a central part of their strategy.
Understanding the Limitations of Six Sigma
After I left General Electric to join Danaher, CEO Jack Welch jumped on the six sigma bandwagon in such a big way that it became almost a religion. And, of course, if Jack thought it was a smart thing to do, it did not take long for many other companies to copy GE. I always thought this was a big mistake for GE and a waste of its tremendously talented workforce.
The problem is that, although you can get some gains (admittedly, sometimes significant gains) with six sigma, this approach only goes after 10% to 20% of what is possible. That means you can have thousands of successful six sigma projects to brag about without much effect on the bottom line.
Why? Let’s say you have a product line with 20 value-added steps. Maybe one of the steps is a bottleneck, making it a perfect candidate for a six sigma team. You then focus exclusively on that step. Since you have smart people, you will improve that process and have a great six sigma story to share. Nice, but what about the other 19 steps? You still have them. They may be in different functional departments, but they still exist. So, at the end of the day, you have not gained that much.
On the other hand, if you approach this with a lean mindset, you will see all 20 steps from the start. First, you will take them out of their functional departments and line them up side by side in a one-piece flow line. Then you will look at takt time, which, in turn, will help you see the waste in all 20 processes. As you improve each step, you get huge gains in productivity, quality, waste reduction, lead time reduction and customer service. So while the six sigma approach fixates on one of the 20 steps, the lean approach tackles all of them and delivers much more value to the customer.
Choosing the Easy Way or the Best Way?
So why not use the lean approach? You would think people would want to run their businesses in this demonstrably superior way. The answer is that lean requires a drastic change in the traditional way of running a business, while six sigma does not. In the example I just gave, the lean team would go into the functional departments and rearrange all 20 machines into a one-piece flow line. That kind of radical change is terrifying for the traditional manager. Those machines have not moved since they came into the plant 15 or 20 years ago. Moving them would be disruptive and would cost some money.
And then, of course, there is the universal question: “But what if it doesn’t work?”. Simply pursuing six sigma gains involves none of these tough challenges. Everything can stay essentially the same, and the six sigma team can just work on the bottleneck process in the functional department where it lives. There are no disruptions or moving costs, and no worry about it not working. Six sigma, for most companies, is the right choice. That way they avoid this “lean nonsense.”
Six sigma also fits much better with the safe, studied way traditional companies solve problems. When faced with any serious problem to consider, most companies form a team that meets once a week to study the situation and develop a plan. That team is usually a group of salaried employees who collect and analyze data (you can easily draw a comparison with a group of salaried six sigma experts as the team members in this case). Since not everyone can make every meeting, it can take two to three months to come up with a plan and agree on it. Excellent. Now management needs to approve that plan – another month.
The lean approach is quite different. It will also start by forming a team – only this one is made up equally of hourly and salaried employees who will leave their full-time jobs for a week and will be given a very ambitious set of goals to meet by the end of the week. For example, they may start moving equipment on the afternoon of the first day. As a result, they will have a new line up and running by the end of the week, with reductions of more than 50% in floor space, inventory, people, defects and lead time.
Assessing the Value of ‘Belt’ Certifications
And what about Black Belts, Green Belts and Yellow Belts? Aren’t they important? My answer is: “Look, you are running a business, not a karate class,” which always shocks people – perhaps because it is true. Companies spend a lot of time and money (up to several years) training a small select group of salaried employees to do SPC. Typically, they take part in six sigma study teams and then return to their normal jobs. They may get a nice certificate and a colored belt, but after all the training time, cost and award ceremony, they rarely end up doing six sigma full time. I prefer the lean approach of forming a Kaizen Promotion Office (KPO) with higher-potential employees. Their full-time job is to organize, run and follow up on kaizen events. They learn lean by doing lean in a hands-on approach under the guidance of an outside lean sensei. A good rule of thumb is to keep them in the KPO full time for about two years and then move them on.
Six Sigma enthusiasts have told me that black and green belts are important ways to recognize the extra training given to their selected salaried employees. Fine, I get the idea, but how about just promoting them? Our best and brightest go to the KPO so they can become lean experts. Then, after two years, we promote them to run something, as a team leader, plant manager or something else. That always seemed more important to our business than giving them a certificate and a belt they could put away in a drawer.
I am sure I will get some negative feedback on this article. And that is fine. I am just trying to point out that six sigma is comfortable because there is not much to change with it. But, unfortunately, that includes its results. On the other hand, adopting lean is very uncomfortable – until you see the results. The choice is yours.