Metrics in Lean
Since childhood, we have all wanted to know what grades we got on our report cards and what those grades mean in terms of how we are doing. We want to be evaluated on the basis of parameters we know and that we can affect through our efforts.
A key issue in manufacturing is the consistency that exists from a work area, to the department and to the company as a whole. We do not want to use parameters whereby excellent local performance can add up to poor global performance. Once performance measures are selected, the next challenge is to use them as a basis for management decisions that are in the company's best interests, while being fair and non-threatening to our team members. In particular, actions taken to improve one aspect of performance should not degrade another. Beyond these issues, in a lean environment, we need to consider the impact of improvement projects, before and after they are carried out.
Measuring results or compliance with processes?
One possible approach to evaluation is to measure how close our practices come to the standard of how things should be. This is how you will be evaluated if you apply for the Malcolm Baldridge Award or for ISO-900X certification. It matters little whether the quality of your output is good, as long as you follow the “right” processes. Iwao Kobayashi's “20 Keys” approach follows the same logic. The keys have names such as “Cleaning and Organizing” or “Quick Changeover”, and each key has five performance levels. By definition, a plant that is at level five on all 20 keys is excellent.
The advantage of process measures is that the corrective action for poor performance is always to bring the plant closer to compliance. But is it impossible for a plant to be at level 5 on all 20 keys and still chronically lose money? Wouldn't some indicators be more important than others? The world would be simpler if a process guaranteed excellence.
In fact, all of a factory's stakeholders care much more about the results it achieves than about the processes it has. Most commonly used are the five dimensions of Quality, Cost, Delivery, Safety and Morale. More generally, Harvard's R. Kaplan proposed a “balance scorecard” to measure the multiple aspects of business performance, as opposed to manufacturing performance alone.
Requirements for Indicators
Indicators should focus on results rather than process compliance. The criteria of the Malcolm Baldridge Award, ISSO-900X or Kobayashi's 20 keys (keys to workplace improvement) promote performance measures based on check lists of how close practices actually are to some norm. The problem with this approach is that it is possible to score high on this kind of check list and still go bankrupt. In other words, it is not what you do that counts, but what good it does. The key requirements for indicators are the following:
- A good indicator is immediately understandable. No training or even explanation is needed to understand what it means, and the number maps directly onto reality, free of any manipulation. A common kind of manipulation is to assume that a particular ratio cannot exceed 85%, and to redefine 85% as “100% performance”. While this makes performance look better, it also makes the number misleading and hard to interpret.
- People see how they can affect the result. With a good indicator, it is also easy to understand what kinds of actions can affect the indicator's value. A shop-floor indicator, for example, should not be a function of the price of oil on the world market, because there is nothing operators can do to affect that. Their actions, on the other hand, can affect the number of labor hours required per unit, or the rework rate.
- A better indicator always means better performance for the company. One of the hardest things to ensure is that a better indicator value always translates into better business performance for the company. Equipment efficiency measures are known for failing in this area, because maximizing them usually leads to overproduction and the buildup of work-in-process inventory.
- The indicator's input data must be easy to obtain. Lead time statistics, for example, require time stamps of entry and exit per unit of production. The difference between these times provides only clock times, not working times. To obtain lead times in working time, you need to associate the time stamps with the plant's work records. Lead time information, however, can be inferred from work-in-process inventory and work-in-process time data, which can be collected through direct observation of work-in-process inventory on the shop floor. Work-in-process inventory indicators therefore contain essentially the same information, but are easier to calculate.
- All indicators should have adequate sensitivity. If daily fluctuations are not of interest, then they need to be filtered out. A common method for doing this is to calculate a 5-day moving average instead of individual values – that is, the point plotted today is the average of the values observed over the last five days. Fluctuations are eliminated, but weekly trends will clearly appear.
Portuguese translation by Tamiris Masetto Manzano.